Travelling Formwork System for Free Cantilever Construction

BRIDGEBUILDER Enhance The Economic Performance of Bridge Projects.

Reliable Bridge Construction Equipment for Free Cantilever Construction with NRS Innovation and Solutions.

The Overhead and Underlane NRS Formtraveller which is widely and well known as the Bridgebuilder, is the most reliable and extensively used FormTraveller system in the world for in-situ construction of free cantilever post tensioned box girder bridges as well as cable-stayed concrete bridges.

It has been adopted as the de facto design that is widely used among all suppliers in the industry.

The “Bridgebuilder” formtraveller system was invented in 1970 and today it is acclaimed for enhancing the cost-effectiveness of bridge projects worldwide.

The Bridgebuilder has undergone vast improvements over the years and incorporated innovative solutions, making it a developed, practical and reliable system for contractors.

Today the Bridgebuilder is a versatile, lightweight, easy-to-assemble and operate.

The system is designed with the following cost savings solutions:

  • Special “Fast-Split” installation method on hammerhead as short as 7m long.
  • NRS Bridgebuilder with cross member for Hammerheads as short as 3m.
  • Back launching to pier for ease of dismantling after use
  • Use of Bridgebuilder for casting hammerhead
  • Casting closure segment stitches.

Modern bridges are becoming wider and longer but at the same time clients and contractors are seeking shorter construction time. In NRS, pursuing improved and innovative solutions to meet these requirements has always been one of NRS main goals.

NRS never fails in giving innovative designs even for conventional equipment like the Formtraveller